Fairmont Pyramids… Trinity operates on an engineering level that accepts no mistakes

When MJK SUN, the owning company, placed its trust in Trinity, the requirement was not mere execution—it was precise engineering excellence at the most critical points of the project.

  • Construction of water tanks

  • Adjustment of the main structural columns

  • Managing a massive construction area of 12,000 m² out of a total 33,000 m²

Execution began in October 2024, with a strict one-year deadline.

The site is iconic, the requirements are highly sensitive, but with Trinity, every challenge has a calculated and professional engineering solution.

Trinity builds Fairmont with a quality worthy of the Plateau’s name.